– Project Value $251,000
This high visibility sports facility was purpose built for the Commonwealth Games on a demanding timeline, and included the installation of a $750,000 feature totem pole by Indigenous totem pole artist Bill Reid.
• harvesting and screening existing topsoil for re-use
• excavation of subsoils
• broom finish concrete sidewalks
• dry stack basalt boulder retaining walls
• concrete totem pole plinth
• irrigation system
• chain-link fencing
• topsoil and plant installation
©2024 LANDESIGN LANDSCAPE CONSTRUCTION (2024) LTD. Web design by HELEN