Second Beach at Stanley Park – Project Value $405,000

Prior to the reconstruction of this site for the Vancouver Parks Board, the field north of the beach had been a major depression, collecting water each winter and remaining unusable for much of the year. The contract involving hauling in several hundred truck loads of structural fill to create the gentle mound which exists today.

Landesign’s scope of work included:

  • site works, hauling fill, shaping of land
  • underground drainage system and manholes, connect to COV storm system
  • asphalt pathways and roadways
  • playground equipment
  • up-stand concrete walls and stairs
  • masonry granite walls
  • irrigation system
  • topsoil and tree installation
  • hydroseed